Triple Point enjoys helping our clients bring their development ideas to life. Whether your project is urban redevelopment, new development, or maximizing the land use of existing development, our civil engineers deliver a broad range of master planning and design services to meet your specific goals and objectives.


-
Commercial Site Design
-
Residential Subdivisions
-
Road Design
-
Utilities
-
Flood Analysis
-
Storm Water Quality Design
-
Storm System Design


Frequently Asked Questions
Due diligence is the process of evaluating a commercial property before purchase to identify potential risks and avoiding costly surprises after closing. Triple Point Engineering can assist in the due diligence process by providing Phase I and Phase II Environmental Site Assessments (ESAs), reviewing flood zones and wetlands, evaluating stormwater management requirements, and performing preliminary site feasibility assessments. We also coordinate topographic and boundary surveys and geotechnical investigations to help identify potential development constraints before the property is purchased.
A Land Disturbance Permit (LDP) helps ensure land-disturbing activities are conducted in a way that prevents sediment from leaving the site, minimizes erosion, and protects nearby waterways. The permitting process usually involves preparing an Erosion, Sedimentation, and Pollution Control Plan (ES&PC Plan), developing grading and drainage plans, designing stormwater management facilities, and submitting engineering plans to the Local Issuing Authority (LIA) for review before land-disturbing activities begin. Projects that disturb one acre or more must also obtain coverage under the Georgia NPDES Construction Stormwater General Permit. Depending on the project's location and scope, additional local, state, or federal permits and approvals may also be required.
The purpose of stormwater detention is to temporarily store rainwater runoff so that it can be released at a controlled rate, helping reduce downstream flooding, erosion, and damage to public drainage systems. Typically, runoff is captured in a detention pond or underground detention system. The type of stormwater management system used depends on the site's topography, soil conditions, available space, local regulations, and the amount of runoff generated by the proposed development.Unlike a retention pond, which permanently holds water, a detention system temporarily stores stormwater and slowly releases it after a rainfall event. Properly designed stormwater detention systems are often required as part of commercial and residential developments to help manage runoff and comply with local stormwater regulations.
Site development begins during the earliest stages of project planning with due diligence, feasibility studies, and conceptual site planning. This process often includes evaluating soil conditions, topography, utilities, traffic, drainage, and environmental constraints to develop a conceptual site layout that meets a client's long-term project goals. The process continues as the civil engineer works alongside architects, surveyors, and other design professionals to finalize the design, obtain permits, and support construction through project completion.Every project is different, but early site development helps identify potential challenges before construction begins, reducing delays and helping projects stay on schedule and within budget.
Yes. Triple Point Engineering provides septic system design services for commercial, institutional, and industrial projects where access to a public sanitary sewer system is unavailable. Our engineers evaluate soil conditions, topography, wastewater flows, and available land area to design reliable septic systems that comply with local health department requirements and meet each client's long-term needs. Whether you're developing a commercial building, school, church, or industrial facility, we can evaluate your site to determine whether a septic system is a practical and cost-effective solution.
Unsuitable soils, sometimes referred to as poor soil conditions, are a common challenge during site development, but they do not necessarily prevent a project from moving forward. If unsuitable soils are encountered, a geotechnical engineer will evaluate the extent of the problem and recommend the most appropriate solution. Corrective measures may include removing and replacing unsuitable soils, modifying roadway or foundation designs, improving site drainage, or stabilizing soils with additives such as lime, cement, or geotextiles. The key to minimizing delays and unexpected costs is identifying unsuitable soils early in the planning process. For this reason, civil engineers often recommend a geotechnical investigation before design begins.
Absolutely. Triple Point Engineering serves as our clients' engineering representative throughout the local planning and zoning approval process. We prepare technical documents, coordinate with planning staff, attend public meetings, and present the engineering aspects of proposed developments before planning commissions, zoning boards, and governing authorities to help clients obtain the approvals needed for successful development. Whether your project requires a rezoning, variance, special use permit, or site plan approval, our team works closely with local officials to help navigate the approval process as efficiently as possible.